
Röwer & Rüb loose boxes
The construction of a loose box determines its safety, the stable's microclimate and how smoothly daily work goes — for decades of use.
We are the exclusive distributor of Röwer & Rüb in Poland. It is a family manufacturer from Lower Saxony, in business since 1867, and today the leading producer of stable equipment in Europe. We do not sell from a catalogue — every loose box is made to measure for a specific building.
Let's talk about your stable See the projects

Why Röwer & Rüb in particular
There are a dozen or so loose box manufacturers on the market. The difference lies not in what you see in a photo, but in what you see after five years of use.
Fully welded perimeter frame
Their own C-profiles and a frame welded all the way round. This is what takes the load when a horse leans its full weight against the partition. Bolted constructions work loose over time — a welded one does not.
Every edge finished
All metal parts are rounded and free of burrs. The hinges have rounded covers. This is not cosmetic — it is a list of the places where a horse can injure itself.
50 mm bar spacing
Narrower than with most manufacturers. There is one reason: with wider spacing a hoof can get wedged in the grille.
Three metal finishes
Hot-dip galvanising with a natural patina, powder coating in any colour, or stainless steel, which looks like new after years and is the easiest to wash.
Bamboo instead of softwood
Bamboo infill is exceptionally resistant to kicking and chewing, and does not splinter if damaged. An alternative to conventional timber where the horses are demanding.
Doors in line with FN recommendations
Sliding doors made to the current recommendations of the German Equestrian Federation, with a standard night bolt.


How we select the stable fit-out
We start with three questions, not with the catalogue. How many horses and of what type — because a mare with foal needs a different area from a sport horse. How wide the aisle is — because that decides whether the doors can be hinged or have to slide. And who mucks out every day and with what — because that determines thresholds, passage widths and the box fittings.
Only with those answers do we reach for the drawings. Röwer & Rüb has nine design lines named after European cities — Hamburg, Hannover, Berlin, Bremen, Amsterdam, Rome, Verden, Stuttgart and Copenhagen — but each of them is modified to suit the building. A line is a starting point, not a finished product.



The sequence that saves money: we settle the layout of the loose boxes before the building structure is erected. Column spacing and the position of the doors need to be known in advance — moving a wall afterwards costs many times more than a change on the drawing. We describe the whole process on the building a stable page.
Photo gallery




Let's talk about your stable
Loose boxes cannot be reliably priced from a catalogue — the price depends on the layout, the number of boxes and the finish. Tell us what you are building and we will prepare a drawing and a quote.
Frequently asked questions
Is Röwer & Rüb an expensive solution?
More expensive than catalogue stable equipment — yes. But we are talking about something that works for twenty years and is in contact with the horse every day. The price difference is best compared not with a cheaper loose box, but with the cost of replacing the fit-out after five years.
How does galvanising differ from powder coating?
Hot-dip galvanising is the most durable and acquires a characteristic patina over time. Powder coating lets you match the colour to the interior. Stainless steel is the most expensive, but the easiest to maintain and looks like new after years.
Can the fit-out be added to an existing stable?
Yes, that is a common case. We need the interior dimensions, photos and information on the column spacing. The system is modular, so it can usually be fitted without altering the building structure.
How long does a project take?
Typically 8–10 weeks from confirmation of the drawings. The elements are made to measure in Germany, so the lead time runs from approval of the design, not from the first conversation.
Why is there no configurator with prices here?
Because stable fit-out cannot be priced from a table. The price depends on the layout, the number of boxes, the metal finish and the infill. We prepare a quote based on a drawing — it takes a few days and it is reliable.
