When building an arena, clients devote most attention to what can be seen: the sand, the geotextile fibre, the mats and the irrigation systems. Yet the durability of the surface is largely determined by a layer nobody looks at after handover — the arena sub-base. It decides whether the arena will last a few years or as many as 20 without a major overhaul.

What is an arena sub-base?

The sub-base is the foundation of the riding surface — the stabilising layer beneath the riding layer. It has three jobs: to level the ground, to drain excess water properly and to ensure that after a few years the surface does not start to deform. A well-built sub-base means no holes, no ruts and no changes in the top layer of the surface.

It rarely comes up in conversations with clients, and in practice it tends to be overlooked. Every investment in a surface is a major expense — if the sub-base is built badly, after a few years the surface will need a major overhaul, and therefore additional costs.

Cross-section of an outdoor arena sub-base: native ground, 30–60 aggregate, 0–31.5 mm stabilising layer, French drain and riding layer
Cross-section of an outdoor arena sub-base — from the native ground to the riding layer.

Ground investigation and sub-base thickness

Good preparation of the sub-base starts with a ground investigation — especially for outdoor arenas. It shows what is happening beneath the surface of the plot. If the ground is unreliable, for example containing large deposits of clay or silt — very fine fractions that tend to migrate and destroy the top layer of the surface — the sub-base has to be thicker and more elaborate, and replacing the ground more expensive.

In good ground conditions, for example on forest sands or simple low-grade soils, the sub-base is usually about 10–15 cm of 0–31.5 mm aggregate — crushed concrete or another inexpensive material used for road bases. In poorer conditions we add another layer, for example of 30–60 mm aggregate, which strengthens and stabilises the ground.

Diagram: on weak ground, an additional layer of 30–60 mm aggregate on the native ground
On weak ground we add 30–60 mm aggregate beneath the stabilising layer or replace the ground.

The more level the base and the harder the sub-base, the better the surface behaves after 10, 15 or even 20 years.

A well-built arena can work for as long as 20 years without major maintenance. It is the sub-base that ensures the riding layer lies on a stable, level foundation for all that time.

Aggregate: transport is what counts

For the sub-base we choose aggregate as close to the site as possible. It is usually an inexpensive material, and the main cost is transport, not the aggregate itself. That is why we look for the 0–31.5 mm fraction locally, so that it does not have to be hauled from far away.

Diagram: stabilising layer of 0–31.5 mm aggregate, 10–15 cm, compacted, laid to a fall
Stabilising layer: 10–15 cm of 0–31.5 mm aggregate, compacted and profiled to a fall.

Fall: 1–1.5% on an outdoor arena

Many clients are surprised to learn that all outdoor surfaces should have a fall (the exception being sub-surface systems of the Ebb&Flow type). The fall carries away excess water. If an arena is built without a fall, puddles will appear in various places even with very good drainage.

The fall is not large — usually 1–1.5% across the short side of the arena. It is almost imperceptible to the naked eye and cannot be felt by horse or rider, yet it is enough for water to run along it to the drains.

Diagram: native ground profiled to a 1–1.5% fall towards the drainage
A fall of 1–1.5%, already profiled in the native ground, directs water to the drainage.

French drain: pipes in geotextile and permeable backfill

We place the drainage in the finished stabilising layer. We use what is known as a French drain: a trench is cut in the sub-base and drainage pipes about 100 mm in diameter are laid in it. Two things determine whether it will work for years:

  • pipes wrapped in geotextile — a common mistake is buying pipes without this protection; without geotextile the drain will clog and stop working after 2–3 years,
  • permeable backfill — we backfill the drain trench with readily permeable aggregate, for example 8–16 mm with no fines, or with permeable sand. The 0–31.5 mm aggregate of which the stabilised base is made takes up water poorly and is not suitable for backfilling a drain.

Only the combination of a fall, a clear drain and permeable backfill gives certainty that the arena will drain water efficiently.

Diagram of a French drain: Ø 100 mm pipe in geotextile in a backfill of 8–16 mm aggregate
French drain: a Ø 100 mm pipe in geotextile, in a backfill of permeable 8–16 mm aggregate.

Sub-base in an indoor arena: no fall, with a tolerance of up to 2 cm

In an indoor arena the situation is different. We control the weather, so there is no excess water to carry away. A fall would actually be inadvisable — the surface is built relative to the foundations and must be levelled perfectly to zero. Drainage in an indoor arena is therefore unnecessary, as is a fall.

What is crucial, however, is that every layer of the surface — starting with the sub-base — is perfectly level. A common mistake: a laser leveller is hired to spread the top layer of sand, while the sub-base underneath has differences in level of as much as 5 cm. Such a surface will not be uniform, and uniformity is one of the most important qualities of a good surface (more in the article Qualities of a good arena surface).

We build the sub-base in an indoor arena to a tolerance of no more than 2 cm difference in level.

If this stage is done well, the remaining layers will work properly.

Panorama of an indoor arena with the finished riding layer
In an indoor arena the surface needs no fall, but every layer — from the sub-base up — must be level.

You can download the instructions for building the sub-base — separately for an outdoor arena and for an indoor arena — and pass them on to your groundworks contractor: sub-base instructions: outdoor arena (PDF) and sub-base instructions: indoor arena (PDF).

In conclusion

The sub-base is a stage that cannot be seen after handover, but which determines the durability of the whole investment: a ground investigation, the right thickness of layer, a fall on an outdoor arena, a clear drain and a level sub-base indoors. If you are planning a new arena or a modernisation, you can work out a preliminary quote in a few minutes: Get a surface quote online. About a specific project, get in touch with us; you will find examples of facilities in our projects, and surface systems on the arena surfaces page.

Do you have a question, or disagree with something we say in the episode? Write in the comments under the episode on YouTube — I will be glad to reply and return to the subject in the next episode.

We advise, design and supply stable equipment. Since 2012.


This article is based on episode 2 of the ‘Budujemy stajnię’ podcast (YouTube, in Polish). Audio version: episode 2 of ‘Budujemy stajnię’ on Spotify.