Indoor arenas

Indoor arenas — Borga steel structures

In the Polish climate an indoor arena decides whether a yard works for twelve months of the year or for seven. It is usually the largest single item in the whole project.

The structures are supplied by Borga — a manufacturer of steel buildings with its own component production. We are responsible for what is inside: the surface, kickboard, mirrors and lighting. Two companies, one drawing.

Get a quote online Ask an expert

20 × 40 mindoor arena or riding school — 800 m² of arena
20 × 60 mfull-size arena with ancillary facilities — 1,200 m²
25 × 60 msport arena with a competition-size arena — 1,500 m²

Three questions we start with

QuestionWhy it matters
What arena, what discipline?A dressage arena measures 20 × 40 or 20 × 60 m. Jumping needs more room around it. The size of the building starts from this, not from the plot.
What else is to be under the roof?Stands, a warm-up area, boxes alongside the arena. Each of them changes the span and the layout of the structure.
When do you plan the interior equipment?The answer ‘later’ is the most expensive. Column spacing and eaves height must allow for the kickboard, the mirrors and access for the leveller.

Why Borga

Own steel production

Borga manufactures the components in-house. Full control over the chain means predictable delivery dates.

Ventilation

Solutions designed for equestrian buildings — natural ventilation that works without fans and without draughts at horse level.

Daylighting

Rooflights in the roof and walls. The more daylight, the fewer fittings and the lower the electricity bill.

A structure that suits the equipment

Column spacing and fixings can be planned for the kickboard and mirrors if this is raised at the design stage.

Swedish quality, Polish prices

Flexible production methods while remaining cost-effective — the main reason we invited Borga to work with us.

The interior from us

Surface, kickboard, mirrors, lighting and sound as one package, coordinated with the arena's structural designer.

What shapes the budget

FactorHow it affects price
Size and spanThe biggest variable. A wider arena means a heavier structure, not just more metres.
Eaves heightAffects the structure and whether the mirrors and the irrigation boom will fit.
Extent of cladding and rooflightsMore daylighting means a higher structural cost and a lower running cost.
Foundations and site preparationDepends on the ground. This is an item you need to know before signing the contract, not after.
Interior equipmentSurface, kickboard, mirrors and lighting are priced separately from the structure — by us.

Four points worth having in an arena enquiry: column spacing, eaves height, width of the entrance door for the leveller and the method of fixing the kickboard. Agreed at the quotation stage they cost nothing. Corrected after installation — a great deal. We describe the whole process on the building a stable page.

Photo gallery

Indoor riding arena
Indoor riding arena
Indoor riding arena
Indoor riding arena
Indoor riding arena

Let's put real figures on it

The configurator will give a price range in a few minutes — without a conversation and without leaving your details. If you would rather talk, we are on the phone.

Get a quote online Ask an expert

Frequently asked questions

What size of arena to choose?

For leisure riding and a riding school, 20 × 40 m is enough. A full-size dressage arena requires 20 × 60 m. For sport at competition level 25 × 60 m is used, to fit in the arena and a zone around it.

Does 4Horses build indoor arenas?

No. Borga supplies and erects the structure; we are responsible for the interior equipment. We say this plainly — we do not pretend to be a main contractor.

When should the surface and kickboard be ordered?

In parallel with the arena, not after it has been erected. The choice of surface determines the base construction and drainage, and the kickboard — the method of fixing to the columns.

Does the arena have to be heated?

No. In most facilities good ventilation and a frost-resistant surface are enough. Heating an indoor arena is rare and a very high running cost.

How long does building take?

The timescale depends on the design, permits and ground — it is a very individual matter. We plan the structure and the equipment so that the equipment goes in as soon as the shell is closed.

Scroll to top